Actions

Difference between revisions of "Burlington County Public Safety (P25)"

From The RadioReference Wiki

Line 25: Line 25:
  
 
==Extended Implementation Phases==
 
==Extended Implementation Phases==
*1 7/13 3/15 Site Prep / System Specifications / Microwave /Vendor Evaluations
+
*1 July 2013 March 2015 Site Prep / System Specifications /Microwave /Vendor Evaluations
*2 7/14 7/15 Core Network and Consoles
+
*2 July 2014 July 2015 Core Network and Consoles
*3 7/14 12/15 Radio Infrastructure
+
*3 September 2014 December 2015 Radio Infrastructure Procurement
*4A 10/15 2/16 Subscriber Equipment
+
*4A October 2015 March 2016 Subscriber Equipment
*4B 3/16 7/16 Subscriber Equipment
+
*4B April 2016 September 2016 Subscriber Equipment
*4C 8/16 1/17 Subscriber Equipment
+
*4C October 2016 March 2017 Subscriber Equipment
  
 
==Related Links==
 
==Related Links==

Revision as of 00:00, 15 July 2014

Template:Trunking Infobox


Template:P2Tracker


Additional FCC Callsigns

Extended Implementation Phases

  • 1 July 2013 – March 2015 Site Prep / System Specifications /Microwave /Vendor Evaluations
  • 2 July 2014 – July 2015 Core Network and Consoles
  • 3 September 2014 – December 2015 Radio Infrastructure Procurement
  • 4A October 2015 – March 2016 Subscriber Equipment
  • 4B April 2016 – September 2016 Subscriber Equipment
  • 4C October 2016 – March 2017 Subscriber Equipment

Related Links


Return to Burlington County Public Safety P25