Actions

Difference between revisions of "Kiehin IPT Manufacturing"

From The RadioReference Wiki

m
Line 4: Line 4:
  
 
The radio system is licensed to Keihin IPT through Emergency Radio Systems.
 
The radio system is licensed to Keihin IPT through Emergency Radio Systems.
 +
 +
Frequencies Used and LCN (Confirmed)Site 1 Fixed Antenna on top of the plant
 +
451.7750  03
 +
451.9500  07
 +
452.0000  11
 +
452.1750  15
 +
464.4375  19
 +
 +
Frequencies used for Site 2 which are mobile/portable units
 +
451.7750
 +
451.9500
 +
452.0000
 +
452.1750
 +
452.2000
 +
452.2250
 +
456.7750
 +
456.9500
 +
457.0000
 +
457.1750
 +
457.2000
 +
457.2250
 +
464.4375
 +
469.4375
 +
 +
 +
 +
Talkgroups Used
 +
0-03-125 Production
 +
0-03-130 Supervisors
 +
0-03-140 Security*
 +
0-03-150 Maint and Production operations
 +
0-03-180 Production
 +
0-03-185 Tool & Die
 +
 +
0-07-150 Heating/AC repair as well as plant operations
 +
0-07-100 Production
 +
0-07-125 Production
 +
0-07-150 Final Inspection
 +
 +
0-15-150 Production
 +
 +
0-19-100 Production
 +
0-19-200 Plant Electrical Dept
 +
 +
*Security handles all facets of plant and grounds security. Everyone entering property must go through main gate. Security also deals with all plant alarms, as well as door and gate opening and closing.
  
 
[[Category:Midwest Region]]
 
[[Category:Midwest Region]]

Revision as of 13:23, 16 July 2010

Company Website

The Greenfield plant makes fuel injection parts.

The radio system is licensed to Keihin IPT through Emergency Radio Systems.

Frequencies Used and LCN (Confirmed)Site 1 Fixed Antenna on top of the plant 451.7750 03 451.9500 07 452.0000 11 452.1750 15 464.4375 19

Frequencies used for Site 2 which are mobile/portable units 451.7750 451.9500 452.0000 452.1750 452.2000 452.2250 456.7750 456.9500 457.0000 457.1750 457.2000 457.2250 464.4375 469.4375


Talkgroups Used 0-03-125 Production 0-03-130 Supervisors 0-03-140 Security* 0-03-150 Maint and Production operations 0-03-180 Production 0-03-185 Tool & Die

0-07-150 Heating/AC repair as well as plant operations 0-07-100 Production 0-07-125 Production 0-07-150 Final Inspection

0-15-150 Production

0-19-100 Production 0-19-200 Plant Electrical Dept

  • Security handles all facets of plant and grounds security. Everyone entering property must go through main gate. Security also deals with all plant alarms, as well as door and gate opening and closing.