Actions

Difference between revisions of "Tilt-Over Mast"

From The RadioReference Wiki

Line 13: Line 13:
 
http://i21.photobucket.com/albums/b287/tonsoffun26/Tilt-Over%20Mast/100_0921.jpg
 
http://i21.photobucket.com/albums/b287/tonsoffun26/Tilt-Over%20Mast/100_0921.jpg
  
The little piece of pipe in the middle is just a spacer with some additional 3/16" flat bar for spacing. The flat bars that are welded on the top is 3/16"x10" and holds the the base pieces together and will show its purpose in another photo.
+
The little piece of pipe in the middle is just a spacer with some additional 3/16" flat bar for spacing. The flat bars that are welded on the top is 2"x10"x3/16" and holds the the base pieces together and will show its purpose in another photo.
  
 
http://i21.photobucket.com/albums/b287/tonsoffun26/Tilt-Over%20Mast/100_0927.jpg
 
http://i21.photobucket.com/albums/b287/tonsoffun26/Tilt-Over%20Mast/100_0927.jpg

Revision as of 18:50, 3 January 2008

Here is some info for a Tilt-Over mast that I am constructing and hopefully give some IDEAS for people to build for their scanner antennas. Please remember that this is only to give people ideas and is not an engineered structure. Remember that you can be KILLED if you hit any power lines with this mast, so read here

I wanted something that will be easy to lower and raise and mostly be very safe to work on. When building this mast you should get a good-quality winch to raise and lower the mast. I bought a motorized winch (2000 lbs.) that has a brake so if you let go of the buttons when raising and lowering the mast, it stops right away. I bought it on sale for $59.00. The hand winch I wanted was $50.00, so I went with the motorized since it was only $9.00 more. People that are thinking of building this would need a welder. If you don't have one you can get a welding shop to weld up the base for you.

I got the idea from a old Fire Hall that had a mast to hold there flags up. From there I had this picture in my head for my scanner antennas. I started thinking about materials to build this monster mast and started to design it differently. The Fire Dept had C-channel for the base coming from the concrete that is in the ground. I needed some round pipe for the mast so why not have the round pipe for the base as well. I went to a plumbing supplier and looked for a pretty solid pipe, and the store employee directed me to 2" Schedule 40 pipe, which comes in 21 foot lengths. I wanted more height then that, so I also purchased a length of 1 1/2" Schedule 40 pipe to fit inside the 2" pipe. So I bought another 2" schedule 40 pipe 21 foot long for the concrete base. So total material so far is: 2 pcs 21'x2" schedule 40 pipe 1 pcs 21'x1 1/2" schedule 40. This piece is cut down to 15' long for the top mast

Okay, here is the base that is starting to take place. I took one length of pipe that was 21' long and cut it to make two 10'-long pieces. 5' is going into the concrete and 5' is the top.

100_0921.jpg

The little piece of pipe in the middle is just a spacer with some additional 3/16" flat bar for spacing. The flat bars that are welded on the top is 2"x10"x3/16" and holds the the base pieces together and will show its purpose in another photo.

100_0927.jpg

This is the top part of the base that is not going to be in the concrete. The space in the middle is where the mast is going to go. As you can see, those bolted plates do come off when the mast is going to be lowered. The other flat bar in the middle is where the winch is going to be attached.

100_0926.jpg

Here is the bottom of the base that is going in the hole. I will add some gravel for drainage before pouring the concrete.

100_0930.jpg

This is the 2" bottom mast that is drilled with a 3/8" hole in 2 areas for the 1 1/2" mast. This way it is going to be easy when inserting the 1 1/2" pipe to have the pipe marked then drilled.

100_0929.jpg

This is the 1 1/2"x21' long mast. This is going to be inserted in the 2" bottom mast. If you look closely, you will see to little rings that I made up so when inserted in the 2" mast it will fit nice and snug.This is done in the first 3 foot part of the 1 1/2"x21'. Then just above the first ring I drilled the 3/8" holes right through the mast and also do this above the second spacer ring. After welding the rings in place I tried to insert the the masts together but had to grind a little all around the ring to size it up properly. After grinding the rings the 1 1/2" top mast fit perfectly in the 2" bottom mast with little movement.

Note: I drilled the 2" mast pipe first so I can mark the 1 1/2" once it fit properly.

Thanks to my nephew, I finally got some time and some help digging my hole.

100_1009.jpg

It does not look like it but the hole is 14" diameter and 5' deep. The hole was dug more on the angle towards the bottom to protect from frost and to be more stable. So the bottom of the hole is probably around 16" to 17" diameter.

100_1008.jpg

Finally got a chance to put the base in the hole. It took 10 bags (30 kg) to fill the hole! The Corona tasted so good after I was done in the hot sun. I braced the base with 2 2x4's and made sure it was all plumb and good. It turned out perfect.

100_1127.jpg

100_1129.jpg

Here is the mount for the motorized winch ($59.00) to be bolted. The winch was on sale and was a little more then the hand winch ($50.00) so I went with the motorized. Plus it is better since there is a brake when raising or lowering in case of an emergency.

100_1131.jpg

Now to start painting the mast to mount in the centre of the base and hopefully everybody is starting to get what I am trying to do.

Here is the mast installed.

100_1165.jpg

Here is another full shot of the mast

100_1163.jpg

Here is the base of the mast where it pivets on the bolt(1/2") and as you can see the grounding cables.

100_1160.jpg

This is the top flat bar that holds the mast.Note:The other side of this plate and the bottom plate is welded to the base and the bolt is welded in place also, only this one side comes off.

100_1161.jpg

Here is the other side of the grounding cables.

100_1170.jpg

Here is the winch bolted and ready for operation.

100_1180.jpg

This is where I put the cable from the winch on the mast, probably around the 6 1/2' mark.

100_1181.jpg

This pic shows the mast lowered to work on the cable and antennas.

100_1182.jpg

Here is the pulley that is on the base where the cable rides on when raising and lowering. You can see the front upper and lower plates are unbolted to lower the mast.Those bolts are welded in place so they do not come off.

100_1185.jpg

Here is the rotor in place and took all day to paint the rotor and run all the cables, so it is time to relax for tomorrow to mount the antennas.

I ran the cables in a conduit underground to a outdoor sealed box mounted to the house for a better appearence. Here is the inside of the box for the TII surge protectors for all cables.

100_2007.jpg

100_1199.jpg

100_1200.jpg

100_1202.jpg

And now what everybody is waiting for, the antennas!!!

100_1193.jpg

100_1195.jpg

100_1197.jpg

Hopefully everybody liked my ongoing project and hopefully use these ideas. I enjoyed everyone's comments and ideas and thanks for letting me post the pics and info.

Take care Tonsoffun www.scannerstandman.com